Skip to content
Ridgewed Engineering
Track record

Projects

Delivered for municipal authorities, national utilities and private clients since 1995.

Clients and sites

Project record

  • Zimbabwe Power CompanyHwange Power Station2018
  • Harare MunicipalityCrowborough Sewage Works1995–96
  • Harare MunicipalityFirle Sewage Works1995–96
  • Harare MunicipalityMorton Jaffray Water Works, Manyame1995–96
  • City of HarareMt Pleasant Swimming Pool, All Africa Games1995
  • City of GweruSouthdowns Sewage Pump Station1996–97
  • National Museums and MonumentsShangani water supply1998–99
  • NationwideFarms, mines and industry2003–06
Case study

Hwange Power Station

Zimbabwe Power Company · 2018

In 2018 Ridgewed Engineering was awarded a contract by Zimbabwe Power Company for hydraulic analysis for Stage 1 low pressure condensate extraction pumps at Hwange Power Station.

The work applied our own hydraulic analysis methods to a live generating asset, assessing system resistance, duty points and pump performance across the condensate circuit.

Pump sets and large-bore discharge pipework in an industrial pump house
On site

Installed plant

Two end-suction pump sets coupled to electric motors on a shared plinth inside a pump station, with valves and gauges above
Blue pump sets and suction pipework mounted alongside a water channel at a treatment works
Contact us

Let’s discuss
your project

Ridgewed Engineering supplies, installs and commissions pumping plant across Zimbabwe. Get in touch to discuss your requirement.

Call us on +263 77 612 8662

What we undertake

  • One year guarantee on every installation
  • Trained operators and handover documentation
  • Strict safety policy on every site

Get in touch

Phone or email us directly.

Registered and compliant

Incorporated
December 1993
Company registration no.
5403/93
VAT registration no.
10066855